Rural
11 June, 2026
Work to commence on Goulburn Road upgrade at Boro
Work will be carried out on Goulburn Road over the next five months.

Work will be carried out on Goulburn Road over the next five months.
The work will be carried out from tomorrow (Thursday, June 11) from 1.1 kilometres north of Duckfield Road to 100 metres south of Barnet Drive, Boro.
Work will be carried out for up to five months from 7am to 6pm on weekdays and from 8am to 2pm on Saturdays, weather permitting.
Single lane closures with alternating (stop/slow) traffic conditions will allow motorists to pass in one direction at a time.
Traffic control and a reduced speed limit of 40 km/h will be in place for the safety of workers and motorists.
Outside of working hours, a reduced speed limit of 60 km/h will be in place.
Motorists are advised to drive to the conditions, follow the directions of signs and traffic control and to allow for five minutes of additional travel time.
--------------
Subscribe to The Southern Wire Newsletter for free at the link below.
https://subscribe-forms.beehiiv.com/1986abc6-c89e-4781-9db2-cf35c9dd71e4
If you value independent local journalism across the Highlands, Tablelands and Wollondilly, please click the link below to support us to ensure we remain paywall free.
Read More: Goulburn, Southern Tablelands